Cantidad
Precio U. $
Costo $
%
OBRA MONTPELLIER
 
73908.28
100.00 %
OBRA NEGRA
 
27564.23
37.30 %
6.615 M2
17.173
113.60
0.15 %
2.573 M3
366.661
943.42
1.28 %
5.7072 M3
420.791
2401.54
3.25 %
7.2 M2
13.878
99.92
0.14 %
5.408 M2
149.215
806.95
1.09 %
6.76 ML
391.182
2644.39
3.58 %
2.56 M2
277.732
710.99
0.96 %
7.2 ML
234.293
1686.91
2.28 %
2.4854 M3
612.864
1523.21
2.06 %
6.405 M2
245.350
1571.47
2.13 %
14.91 M2
254.893
3800.46
5.14 %
1.55 ML
232.625
360.57
0.49 %
6.4 ML
210.765
1348.90
1.83 %
20.4 ML
248.118
5061.60
6.85 %
6.615 M2
488.352
3230.45
4.37 %
1.44 M2
261.560
376.65
0.51 %
9.6 ML
92.000
883.20
1.19 %
OBRA GRIS
 
10039.06
13.58 %
42.305 M2
114.613
4848.71
6.56 %
5.4 M2
124.399
671.75
0.91 %
40.3 ML
112.124
4518.59
6.11 %
OBRA BLANCA TERMINADOS
 
36304.99
49.12 %
11.425 M2
343.990
3930.09
5.32 %
8.665 M2
430.244
3728.06
5.04 %
5.4 M2
53.557
289.21
0.39 %
27.02 M2
47.740
1289.93
1.75 %
1 PZA
2207.781
2207.78
2.99 %
1 PZA
5408.759
5408.76
7.32 %
1 PZA
1708.987
1708.99
2.31 %
1 PZA
787.950
787.95
1.07 %
1 PZA
3165.947
3165.95
4.28 %
1 PZA
720.211
720.21
0.97 %
1 PZA
449.052
449.05
0.61 %
1 PZA
641.993
641.99
0.87 %
1 PZA
684.743
684.74
0.93 %
1 PZA
843.972
843.97
1.14 %
1 PZA
1012.683
1012.68
1.37 %
1 PZA
9027.879
9027.88
12.21 %
6.405 M2
63.660
407.74
0.55 %
» 1.1 OBRA NEGRA 6.615 M2 PU $ 488.35206 $ 3230.44887
Suministro y colocación de Losa de concreto de 10cm de espesor con acero de reforzado a base de armado con varillas #3 @ 20cm en ambos sentidos f'y= 4200 kg/cm2. Concreto F'c=250 kg/cm2 cimbra de losa común con tarimas de madera de 3a. incluye: traslapes, ganchos, cortes, habilitado, colocado, armado, amarres, cimbrado y descimbrado, nivelación de cimbra, silletas o pollos, colado, vibrado, curado, calafateado.
Cuantificación
Nombre
Método
Piezas
 
Cantidad
Losa maciza de 10cm
Rec
1
Largo:
  2.1
Ancho:
  3.15
6.615

Losa maciza de 10 cm espesor
Precio unitario
Insumo
Unidad
Cantidad
Precio $
Costo $
Alambre recocido cal 16 (0.01961 kg/Mt - 51.4 Mt/Kg)
kg
0.75
14.220
10.6650
Varilla 3 Diam 3/8" 0.557 kg/mt
ton
0.00749
13534.480
101.3730
Ayudante Albañilería
jor
0.25
272.250
68.0620
Oficial albañil
jor
0.13
374.990
48.7480
Revolvedora de concreto 1 saco, 8 hp
hora
0.1
23.360
2.3360
Vibrador de concreto 4 hp a gasolina
hora
0.1
80.000
8.0000
cimbra en losas 20 a 10 m2/m3 con duela 1x4" BASICO
M2
1.1
60.904
66.9944
concreto f'c=250 kg/cm2 revenimiento 8a10 cm agregado 3/4" BASICO
M3
0.112
1595.249
178.6679

Materiales
$ 357.70052
73.24644514516143 %
73.24644514516143%
Mano de Obra
$ 116.81120
23.919465032998296 %
23.919465032998296%
Herramienta
$ 0.00000
0 %
0%
Equipo
$ 10.33600
2.116505870850316 %
2.116505870850316%
Herramienta Menor (3%)
$ 3.50434
0.7175839509899489 %
0.7175839509899489%
Costo Directo
$ 488.35206
100 %
100%
Explosión de Insumos del Concepto
Insumo
Unidad
Cantidad
Acumulable
Precio $
Costo $
 
Agua para construcción en toma domiciliaria
m3
0.02128
0.1407672
5.00
0.1064
0.021787560435223834 %
Alambre recocido cal 16 (0.01961 kg/Mt - 51.4 Mt/Kg)
kg
0.75
4.96125
14.22
10.6650
2.1838753011434417 %
Arena negra por m3
m3
0.05208
0.3445092
300.00
15.6240
3.199331242856553 %
Barrote 2x4" x 8 1/4'
pt
0.385
2.546775
9.20
3.5420
0.7252964197515304 %
Cemento Gris Normal Portland
ton
0.047376
0.31339224
2985.34
141.4335
28.961374324504575 %
Duela de madera de pino 3a. 1" x 4" x 8 1/4' (2.75 PT)
pt
4.389
29.033235
9.20
40.3788
8.268379185167445 %
Grava
m3
0.07168
0.4741632
300.00
21.5040
4.40338063532945 %
Polín de madera de tercera 4" x 4" x 8 1/4' (11 PT)
pt
2.508
16.59042
9.20
23.0736
4.724788105809969 %
Varilla 3 Diam 3/8" 0.557 kg/mt
ton
0.00749
0.04954635
13534.48
101.3733
20.758232370163245 %
Ayudante Albañilería
jor
0.25
1.65375
272.25
68.0625
13.937178873331037 %
Oficial albañil
jor
0.13
0.85995
374.99
48.7487
9.982286159667257 %
Revolvedora de concreto 1 saco, 8 hp
hora
0.1
0.6615
23.36
2.3360
0.47834343211168123 %
Vibrador de concreto 4 hp a gasolina
hora
0.1
0.6615
80.00
8.0000
1.6381624387386344 %
3% de herramienta sobre Mano de obra
3.5043
0.7175839509899489 %
Costo Directo
488.3521
100 %