Cantidad
Precio U. $
Costo $
%
OBRA ASADOR
 
3711.45
100.00 %
PRELIMINARES
 
571.40
15.40 %
1.615 M2
9.461
15.28
0.41 %
1.615 M2
11.269
18.20
0.49 %
0.441 M3
226.788
100.01
2.69 %
2.205 M2
198.598
437.91
11.80 %
ALBAÑILERÍA
 
1747.66
47.09 %
1.615 M2
368.863
595.71
16.05 %
4.32 M2
266.653
1151.94
31.04 %
REPISA MOVIBLE DE CONCRETO
 
1376.66
37.09 %
1.92 M2
514.127
987.12
26.60 %
0.408 M2
366.405
149.49
4.03 %
0.09585 M3
2504.321
240.04
6.47 %
ACABADOS
 
15.74
0.42 %
1 PZA
15.740
15.74
0.42 %