Cantidad
Precio U. $
Costo $
%
OBRA ASADOR
 
3566.53
100.00 %
PRELIMINARES
 
554.09
15.54 %
1.615 M2
9.159
14.79
0.41 %
1.615 M2
11.269
18.20
0.51 %
0.441 M3
226.788
100.01
2.80 %
2.205 M2
190.967
421.08
11.81 %
ALBAÑILERÍA
 
1648.24
46.21 %
1.615 M2
348.959
563.57
15.80 %
4.32 M2
251.081
1084.67
30.41 %
REPISA MOVIBLE DE CONCRETO
 
1364.21
38.25 %
1.92 M2
514.127
987.12
27.68 %
0.408 M2
366.405
149.49
4.19 %
0.09585 M3
2374.428
227.59
6.38 %
ACABADOS
 
0.00
0.00 %
0 PZA
15.503
0.00
0.00 %